Because the cost of steel structure workshop is low, accepted by many manufacturer, general large production enterprise mostly adopts steel structure factory, compared to traditional architecture workshop, steel structure factory building in construction period, project quality is much better than the traditional architecture workshop, and recycled steel structure workshop, also is of great significance in environmental protection, So what are the main factors affecting the cost of steel structure workshop?
1. Materials used
The cost of steel structure plant is affected by a variety of factors, there is a huge difference in the use of plant materials, domestic steel compared with imported steel in the price has a great advantage, and whether the steel structure plant to open a skylight, workshop room, span; Many factors such as crane, crane tonnage and working class are important factors affecting the cost of steel structure workshop.
2. Plant area
Because the greater the building area, the more time and materials consumed, of course, the cost will certainly be larger, the general steel structure plant quotation is the most consideration is the area.
3. Technology and process
The cost of technology will also become a factor affecting the cost of steel structure plant, steel structure company with advanced production technology, excellent design and construction team accurate and fast assembly, easy to make sealed structure and other characteristics in modern construction engineering widely used. Steel structure workshop production refers to the design, installation and construction of residential buildings with steel as building load-bearing beams and columns. The structure of steel structure workshop is difficult, and the technology used will affect the cost of steel structure workshop one of the factors.