The stranding base adopts solid sample pit, manual modeling and core formation technology, and the bottom of the pit is buried with coke block, straw bag, steel pipe and so on to strengthen the exhaust. Sand boxes are set on four sides of the model, and the sand consumption is 70 ~ 100mm.